Solar Installers in Birmingham, UK

10 Companies0 Reviews
AllResidentialCommercialIndustrial

Top Solar Installers in Birmingham

Profiles are listed alphabetically within their publication tier. Verify credentials and references directly.

E
1

Eco2Solar

Est. 2007·Birmingham·Reported 25yr warranty
SolarBatteryMaintenanceEnergy Audit

Reported credentials: MCS · NICEIC · ISO 9001

EP
2

Edan Power

Est. 2010·Birmingham·Reported 25yr warranty
SolarBatteryMaintenanceEnergy Audit

Reported credentials: MCS · NICEIC · HIES

EL
3

EV-PV Ltd

Est. 2009·Birmingham·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · RECC · TrustMark

GE
4

Gallagher Electrical

Est. 1990·Birmingham·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · NICEIC

GS
5

GE Solutions UK

Est. 2008·Birmingham·Reported 10yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · NICEIC · RECC · ISO 9001

GR
6

Greenstorm Renewables

Est. 2020·Birmingham·Reported 25yr warranty
SolarBattery

Reported credentials: MCS · RECC · TrustMark

IS
7

In2gr8ted Solutions

Est. 2007·Birmingham·Reported 25yr warranty
SolarBatteryEV ChargingMonitoring

Reported credentials: MCS · NAPIT · HIES

SE
8

Suntec Energy

Est. 2024·Birmingham·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · RECC · TrustMark · Gas Safe

TE
9

TechFix Electric

Est. 2009·Birmingham·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · NAPIT

WS
10

Westinghouse Solar

Est. 2012·Birmingham·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: NICEIC · City & Guilds

How We Rank Solar Installers

Directory ordering uses currently published profile information. Ratings are withheld unless their source and verification can be documented.

Customer Reviews

Check current customer feedback on its original platform and verify MCS credentials directly.

Certifications

MCS certification is the UK standard. We also check for RECC, TrustMark, NAPIT, NICEIC, and ISO 9001 accreditations.

Track Record

Published profile fields help users compare companies. They do not constitute a quality score.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. Confirm MCS status, active-trading status, references, and contract terms directly before hiring.

10

Published Profiles

0

Customer Reviews

Solar Installation in Birmingham

Birmingham offers strong potential for solar energy generation. UK solar irradiance levels, combined with falling panel costs and the Smart Export Guarantee, make solar a sound investment for homeowners and businesses across the city. A typical 4kW system generates between 3,400-4,200 kWh per year depending on roof orientation, pitch, and shading. South-facing roofs with a 30-35 degree pitch deliver the best performance.

When choosing a solar installer in Birmingham, look for MCS certification as a baseline requirement. This ensures the installation meets industry standards and qualifies you for the Smart Export Guarantee. Check installer reviews, ask for references from local projects, and compare at least three quotes before committing. Many installers in Birmingham also offer battery storage and EV charging solutions, allowing you to maximise your solar investment.

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the UK. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation in Birmingham: Step by Step

1

Free Consultation

Contact an installer for a free site survey. They'll assess your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, expected generation, costs, and projected savings.

3

Installation

Scaffolding goes up, panels and inverter are installed. Most residential systems take 1-3 days.

4

Inspection

Building control sign-off, DNO notification, and MCS certificate issued for SEG eligibility.

5

Go Live

System is commissioned, monitoring is set up, and you start generating clean energy and saving money.

Frequently Asked Questions

How much do solar panels cost in Birmingham?

Solar panel costs in Birmingham are in line with UK averages. A 4kW residential system typically costs between £5,000 and £8,000 including installation. Prices may vary based on roof type, access, and the specific panels and inverter chosen. Get quotes from multiple MCS-certified installers in Birmingham to compare.

Who is the best solar installer in Birmingham?

The best solar installer in Birmingham depends on your specific needs, budget, and project type. Check installer ratings, reviews, certifications (especially MCS), and years of experience on this page. We recommend getting quotes from at least three installers to compare pricing and service.

How long does a solar panel installation take?

A standard residential solar installation takes 1-3 days for the physical installation work. However, the full process from initial survey to commissioning typically takes 4-8 weeks, including site assessment, design, scaffolding, installation, electrical connection, and DNO notification.

Do I need planning permission for solar panels in the UK?

Most residential solar installations in the UK fall under permitted development and do not require planning permission, provided the panels do not protrude more than 200mm from the roof surface and are not installed on a listed building or in a conservation area. Commercial installations and ground-mounted systems may require planning approval.

Are You a Solar Installer in Birmingham?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.