B

BJC Electrical & Solar in Peterborough

Peterborough·Solar Installation
ResidentialCommercial

11+ yrs

Experience

60 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About BJC Electrical & Solar

Published directory profile for BJC Electrical & Solar in Peterborough. Verify services, credentials, ratings, and references directly with their original sources.

Peterborough, PE6 9NY

Peterborough PE6 9NY

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCS

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

PeterboroughSpaldingStamfordBourneMarket DeepingBaston

Customer Reviews

No reviews yet. Be the first to review BJC Electrical & Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from BJC Electrical & Solar?

You can request a quote through the form on this page or contact BJC Electrical & Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does BJC Electrical & Solar serve?

BJC Electrical & Solar is based in Peterborough and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does BJC Electrical & Solar hold?

This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does BJC Electrical & Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask BJC Electrical & Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask BJC Electrical & Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does BJC Electrical & Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask BJC Electrical & Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from BJC Electrical & Solar

Send your project details to request follow-up from BJC Electrical & Solar. Response timing and consultation terms are set by the company.

For BJC Electrical & Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

BJC Electrical & Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.