A

ARD Solar Energy in Gloucester

Gloucester·Solar Installation
ResidentialCommercial
0

80 km

Service radius

2-10

Employees

Profile information

67%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About ARD Solar Energy

NAPIT and MCS registered family-run solar PV installers covering Gloucester, Cheltenham, and the South West

Gloucester, GL1 1JS

Gloucester GL1 1JS

Services Offered

Solar InstallationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPITREAL

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

GloucesterCheltenhamStroudCirencesterTewkesburyRoss-on-WyeHerefordBristolSwindon

Customer Reviews

No reviews yet. Be the first to review ARD Solar Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from ARD Solar Energy?

You can request a quote through the form on this page or contact ARD Solar Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does ARD Solar Energy serve?

ARD Solar Energy is based in Gloucester and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does ARD Solar Energy hold?

This profile lists the following reported certifications: MCS, NAPIT, REAL. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does ARD Solar Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask ARD Solar Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask ARD Solar Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does ARD Solar Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask ARD Solar Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

0
Employees2-10
Profile StatusUnclaimed
Profile Complete67%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from ARD Solar Energy

Send your project details to request follow-up from ARD Solar Energy. Response timing and consultation terms are set by the company.

For ARD Solar Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

ARD Solar Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.