1 Sun Solar Electric in Las Vegas
19+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About 1 Sun Solar Electric
Las Vegas commercial and residential solar installer specializing in solar PV and LED lighting since 2007
Las Vegas, Nevada 89109
Las Vegas, Nevada 89109
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review 1 Sun Solar Electric!
Frequently Asked Questions
How do I get a quote from 1 Sun Solar Electric?
You can request a quote through the form on this page or contact 1 Sun Solar Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does 1 Sun Solar Electric serve?
1 Sun Solar Electric is based in Las Vegas and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does 1 Sun Solar Electric hold?
This profile lists the following reported certifications: NV Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does 1 Sun Solar Electric offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask 1 Sun Solar Electric for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask 1 Sun Solar Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does 1 Sun Solar Electric handle permits and paperwork?
The exact scope is not verified on this profile. Ask 1 Sun Solar Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from 1 Sun Solar Electric
Send your project details to request follow-up from 1 Sun Solar Electric. Response timing and consultation terms are set by the company.
For 1 Sun Solar Electric
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
1 Sun Solar Electric