Solar Installers in Pennsylvania
Compare published solar company information across Pennsylvania, verify credentials directly, and request quotes from local installers.
Find Solar Installers by City
Browse 2 cities in Pennsylvania. Select a city to see local installers.
All Solar Installers in Pennsylvania
20 solar companies across Pennsylvania
Arsenal Solar
Reported credentials: NABCEP · BBB Accredited
REC + Enphase
Bluebird Sky Solar
Reported credentials: BBB Accredited
Tier-1 Monocrystalline + Enphase
Connected Energy Solar
Reported credentials: NABCEP · BBB Accredited
Tier-1 Monocrystalline + Enphase
Energy Independent Solutions
Reported credentials: NABCEP · BBB Accredited
Monocrystalline Tier-1 + Enphase
Envinity
Reported credentials: NABCEP
American-Made Solar Panels + Enphase
Ethical Energy Solar
Reported credentials: NABCEP
US-Made Solar Panels + Enphase
Exact Solar
Reported credentials: NABCEP · BBB Accredited
REC + Enphase
Green Rack Solar
Reported credentials: Tesla Powerwall Certified · Enphase Platinum · Q.CELLS Q.Partner · REC ProTrust
Q.CELLS + Enphase
Green Solar Systems
Reported credentials: NABCEP · BBB Accredited · PA Home Improvement Contractor · City of Pittsburgh Master Electrician
Tier-1 Monocrystalline + Enphase
JC Solar
Reported credentials: NABCEP
REC + Enphase
Open Sky Energy
Reported credentials: NABCEP
REC + Enphase
PA Green Solar
Reported credentials: NABCEP
REC + Enphase
How We Rank Solar Installers
Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.
Customer Reviews
Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.
Certifications
NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.
Track Record
Published profile fields help users compare companies. These details are not a quality score and must be verified directly.
Why Trust the SurgePV Directory?
Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.
20
Published Profiles
0
Customer Reviews
Design Faster. Sell More.
SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.
60%
Faster project design
10 min
Full design turnaround
Frequently Asked Questions
How much do solar panels cost in Pennsylvania?
Solar panel costs in Pennsylvania typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.
What certifications should I look for?
NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Pennsylvania state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.
What solar incentives are available in Pennsylvania?
The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Pennsylvania can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Pennsylvania-specific incentives.
Are You a Solar Installer in Pennsylvania?
List your company for free and connect with local customers looking for solar installation services.
List Your Company Free