G

Green Rack Solar in Pittsburgh

Pittsburgh, Pennsylvania·Solar Installation
ResidentialCommercial

7+ yrs

Experience

120 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Green Rack Solar

Pittsburgh solar installer with more manufacturer certifications than almost any competitor, including Tesla, Enphase Platinum, and Q.CELLS Q.Partner

Pittsburgh, Pennsylvania 15205

Pittsburgh, Pennsylvania 15205

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditRoof AssessmentGrid ConnectionMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Powerwall CertifiedEnphase PlatinumQ.CELLS Q.PartnerREC ProTrustSpan CertifiedSavant Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Q.CELLSREC

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Pittsburgh, PennsylvaniaColumbus, PennsylvaniaCranberry Township, PennsylvaniaWexford, PennsylvaniaWashington, PennsylvaniaCanonsburg, Pennsylvania

Customer Reviews

No reviews yet. Be the first to review Green Rack Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Green Rack Solar?

You can request a quote through the form on this page or contact Green Rack Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Green Rack Solar serve?

Green Rack Solar is based in Pittsburgh and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Green Rack Solar hold?

This profile lists the following reported certifications: Tesla Powerwall Certified, Enphase Platinum, Q.CELLS Q.Partner, REC ProTrust, Span Certified, Savant Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Green Rack Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Rack Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Green Rack Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Green Rack Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Green Rack Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2019
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Green Rack Solar

Send your project details to request follow-up from Green Rack Solar. Response timing and consultation terms are set by the company.

For Green Rack Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Green Rack Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.