P

PA Green Solar in Philadelphia

Philadelphia, Pennsylvania·Solar Installation
ResidentialCommercial

8+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About PA Green Solar

Philadelphia-based solar installer specializing in building-integrated photovoltaic solutions

Philadelphia, Pennsylvania 19122

Philadelphia, Pennsylvania 19122

Services Offered

Solar InstallationSolar DesignBattery Storagebipv_installation

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECCanadian Solar

Inverters

EnphaseSolarEdge

Batteries

Enphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Philadelphia, PennsylvaniaNorristown, PennsylvaniaCamden, PennsylvaniaBensalem, PennsylvaniaChester, Pennsylvania

Customer Reviews

No reviews yet. Be the first to review PA Green Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from PA Green Solar?

You can request a quote through the form on this page or contact PA Green Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does PA Green Solar serve?

PA Green Solar is based in Philadelphia and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does PA Green Solar hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does PA Green Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask PA Green Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask PA Green Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does PA Green Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask PA Green Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2018
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from PA Green Solar

Send your project details to request follow-up from PA Green Solar. Response timing and consultation terms are set by the company.

For PA Green Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

PA Green Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.