Solar Installers in Oregon

Compare published solar company information across Oregon, verify credentials directly, and request quotes from local installers.

20 Companies2 Cities0 Reviews

Find Solar Installers by City

Browse 2 cities in Oregon. Select a city to see local installers.

All Solar Installers in Oregon

20 solar companies across Oregon

AS

A&R Solar

Est. 2007·Portland, Oregon·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: B Corporation · NABCEP

AE

Advanced Energy Systems

Est. 2004·Eugene, Oregon·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: Energy Trust of Oregon Trade Ally · EWEB Approved Contractor · Oregon Department of Energy Authorized · Oregon Contractor License

SolarWorld

BE

Benton Electric

Est. 1967·Eugene, Oregon·Reported 25yr warranty
SolarDesignGrid ConnectionMaintenance

Reported credentials: Oregon Contractor License

CS

Cascade Solar

Est. 2022·Portland, Oregon·Reported 25yr warranty
SolarBatterysystem_design

Reported credentials: Energy Trust of Oregon Trade Ally

C

Climatize

Est. 2018·Eugene, Oregon·Reported 25yr warranty
SolarBatteryDesign

Reported credentials: Oregon Contractor License

ET

Earthlight Technologies

Est. 2016·Eugene, Oregon·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: Oregon Contractor License

EE

Elemental Energy

Est. 2010·Portland, Oregon·Reported 25yr warranty
SolarBatterysystem_design

Reported credentials: BBB Accredited · Energy Trust of Oregon Trade Ally

ED

Energy Design

Est. 2004·Eugene, Oregon·Reported 30yr warranty
SolarBatteryEV ChargingDesign

Reported credentials: Energy Trust of Oregon Trade Ally · Oregon Contractor License

SunPower + SMA

GS

Grape Solar

Est. 2009·Eugene, Oregon·Reported 25yr warranty
SolarDesignGrid Connection

Reported credentials: Oregon Contractor License

Grape Solar

GR

Green Ridge Solar

Est. 2016·Portland, Oregon·Reported 25yr warranty
SolarBatterysystem_design

Reported credentials: BBB Accredited

IE

Imagine Energy

Est. 2004·Portland, Oregon·Reported 25yr warranty
SolarBatteryhvac
IS

Infinity Solar USA

Est. 2015·Portland, Oregon·Reported 30yr warranty
SolarBatterysystem_design

Reported credentials: BBB Accredited

How We Rank Solar Installers

Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.

Customer Reviews

Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.

Certifications

NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.

Track Record

Published profile fields help users compare companies. These details are not a quality score and must be verified directly.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.

20

Published Profiles

0

Customer Reviews

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Frequently Asked Questions

How much do solar panels cost in Oregon?

Solar panel costs in Oregon typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.

What certifications should I look for?

NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Oregon state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.

What solar incentives are available in Oregon?

The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Oregon can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Oregon-specific incentives.

Are You a Solar Installer in Oregon?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.