I

Infinity Solar USA in Portland

Portland, Oregon·Solar Installation
ResidentialCommercial

11+ yrs

Experience

100 km

Service radius

51-100

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Infinity Solar USA

Full-service Portland solar installer with in-house teams and 30-year system warranties

Portland, Oregon 97230

Portland, Oregon 97230

Services Offered

Solar InstallationBattery Storagesystem_design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

30yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Portland, OregonBeaverton, OregonHillsboro, OregonGresham, OregonSalem, Oregon

Customer Reviews

No reviews yet. Be the first to review Infinity Solar USA!

Write a Review

Frequently Asked Questions

How do I get a quote from Infinity Solar USA?

You can request a quote through the form on this page or contact Infinity Solar USA directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Infinity Solar USA serve?

Infinity Solar USA is based in Portland and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Infinity Solar USA hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Infinity Solar USA offer?

This profile reports 30-year panel coverage and 10-year workmanship coverage. Ask Infinity Solar USA for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Infinity Solar USA for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Infinity Solar USA handle permits and paperwork?

The exact scope is not verified on this profile. Ask Infinity Solar USA which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees51-100
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Infinity Solar USA

Send your project details to request follow-up from Infinity Solar USA. Response timing and consultation terms are set by the company.

For Infinity Solar USA

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Infinity Solar USA

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.