B

Benton Electric in Eugene

Eugene, Oregon·Solar Installation
ResidentialCommercial

59+ yrs

Experience

800+

Projects

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Benton Electric

Family-owned electrical and solar contractor serving the Willamette Valley since 1967 with 800+ solar installations

Eugene, Oregon 97402

Eugene, Oregon 97402

Services Offered

Solar InstallationSolar DesignGrid ConnectionMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Oregon Contractor License

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Eugene, OregonAlbany, OregonCorvallis, OregonSpringfield, OregonSalem, Oregon

Customer Reviews

No reviews yet. Be the first to review Benton Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Benton Electric?

You can request a quote through the form on this page or contact Benton Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Benton Electric serve?

Benton Electric is based in Eugene and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Benton Electric hold?

This profile lists the following reported certifications: Oregon Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Benton Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Benton Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Benton Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Benton Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Benton Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1967
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Benton Electric

Send your project details to request follow-up from Benton Electric. Response timing and consultation terms are set by the company.

For Benton Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Benton Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.