Solar Installers in Iowa
Compare published solar company information across Iowa, verify credentials directly, and request quotes from local installers.
Find Solar Installers by City
Browse 1 cities in Iowa. Select a city to see local installers.
All Solar Installers in Iowa
10 solar companies across Iowa
1 Source Solar
Reported credentials: NABCEP
CB Solar
Reported credentials: NABCEP
Current Renewable Efficiencies
Eagle Point Solar
Reported credentials: NABCEP · SEIA
ECG Solar
Reported credentials: NABCEP
Energy Solutions
Heartland Roofing, Siding and Solar
Ideal Energy
Reported credentials: NABCEP · SDVOSB
Purelight Power
Walter Roofing + Solar
Reported credentials: Owens Corning Certified · Versico Certified
How We Rank Solar Installers
Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.
Customer Reviews
Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.
Certifications
NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.
Track Record
Published profile fields help users compare companies. These details are not a quality score and must be verified directly.
Why Trust the SurgePV Directory?
Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.
10
Published Profiles
0
Customer Reviews
Design Faster. Sell More.
SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.
60%
Faster project design
10 min
Full design turnaround
Frequently Asked Questions
How much do solar panels cost in Iowa?
Solar panel costs in Iowa typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.
What certifications should I look for?
NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Iowa state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.
What solar incentives are available in Iowa?
The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Iowa can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Iowa-specific incentives.
Are You a Solar Installer in Iowa?
List your company for free and connect with local customers looking for solar installation services.
List Your Company Free