CB Solar in Des Moines
13+ yrs
Experience
550+
Projects
160 km
Service radius
11-50
Employees
Profile information
About CB Solar
Engineering-led solar contractor delivering turnkey residential, commercial, and agricultural systems across Iowa since 2013
Des Moines, Iowa 50310
Des Moines, Iowa 50310
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review CB Solar!
Frequently Asked Questions
How do I get a quote from CB Solar?
You can request a quote through the form on this page or contact CB Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does CB Solar serve?
CB Solar is based in Des Moines and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does CB Solar hold?
This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does CB Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask CB Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask CB Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does CB Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask CB Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from CB Solar
Send your project details to request follow-up from CB Solar. Response timing and consultation terms are set by the company.
For CB Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
CB Solar