Heartland Roofing, Siding and Solar in Des Moines
13+ yrs
Experience
160 km
Service radius
11-50
Employees
Profile information
About Heartland Roofing, Siding and Solar
Full-service exterior contractor offering roofing, siding, and solar installation across Iowa and Minnesota since 2013
Des Moines, Iowa 50313
Des Moines, Iowa 50313
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Heartland Roofing, Siding and Solar!
Frequently Asked Questions
How do I get a quote from Heartland Roofing, Siding and Solar?
You can request a quote through the form on this page or contact Heartland Roofing, Siding and Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Heartland Roofing, Siding and Solar serve?
Heartland Roofing, Siding and Solar is based in Des Moines and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Heartland Roofing, Siding and Solar hold?
This profile does not list independently verified certifications. Ask Heartland Roofing, Siding and Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Heartland Roofing, Siding and Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Heartland Roofing, Siding and Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Heartland Roofing, Siding and Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Heartland Roofing, Siding and Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Heartland Roofing, Siding and Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Heartland Roofing, Siding and Solar
Send your project details to request follow-up from Heartland Roofing, Siding and Solar. Response timing and consultation terms are set by the company.
For Heartland Roofing, Siding and Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Heartland Roofing, Siding and Solar