E

Edan Power in Birmingham

Birmingham·Solar Installation
ResidentialCommercialIndustrial

16+ yrs

Experience

60 km

Service radius

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Edan Power

MCS, NICEIC, and HIES-regulated solar installer in Birmingham serving residential and commercial clients since 2010

Birmingham, B44 8NH

Birmingham B44 8NH

Services Offered

Solar InstallationBattery StorageMaintenanceEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEICHIES

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

BirminghamGreat BarrWolverhamptonWalsallSolihullCoventry

Customer Reviews

No reviews yet. Be the first to review Edan Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Edan Power?

You can request a quote through the form on this page or contact Edan Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Edan Power serve?

Edan Power is based in Birmingham and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Edan Power hold?

This profile lists the following reported certifications: MCS, NICEIC, HIES. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Edan Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Edan Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Edan Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Edan Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Edan Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Edan Power

Send your project details to request follow-up from Edan Power. Response timing and consultation terms are set by the company.

For Edan Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Edan Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.