i

iGo Solar

El Paso, Texas · Solar Installers
Claimed

10+ yrs

Experience

34 reviews

4.2 avg rating

1-10

Employees

4.2
34 reviews
Est. 2016

SurgePV Score

4.7 / 10
Customer Reviews 84%
Certifications 25%
Experience 67%
Services Range 20%
Warranty Coverage 0%
Online Presence 50%

About iGo Solar

iGo Solar serves the El Paso and West Texas region with affordable solar installations for homes and businesses. We partner with local utilities to maximize rebates and incentives for our customers. Our bilingual team ensures clear communication throughout every step of your solar journey.

7890 Border St

El Paso, Texas 79901

Services Offered

Solar Installers

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Customer Reviews

View all 34 reviews →
4.2

34 reviews

5
0
4
0
3
0
2
0
1
0

No reviews yet. Be the first to review iGo Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from iGo Solar?

You can request a free quote by filling out the form on this page or contacting iGo Solar directly via phone or email. Most installers provide a free initial consultation and site assessment.

What areas does iGo Solar serve?

iGo Solar is based in El Paso. Check the Service Areas section above for a complete list of locations.

What certifications does iGo Solar hold?

iGo Solar meets all required local licensing and insurance requirements for solar installation work.

What warranty does iGo Solar offer?

iGo Solar provides standard manufacturer warranties on all equipment plus workmanship coverage. Contact them directly for specific warranty details.

How long does installation take?

Most residential solar installations are completed within 1-3 days after permits are approved. The full timeline from consultation to activation typically ranges from 4-12 weeks depending on local permitting and utility interconnection processes.

Does iGo Solar handle permits and paperwork?

Yes, most solar installers including iGo Solar handle all necessary permits, utility interconnection applications, and incentive paperwork as part of their service. Confirm specific details during your consultation.

Business Details

Founded 2016
Employees 1-10
Profile Status Unclaimed
Verification Level 2/6
Profile Complete 65%

Trust Score

4.1 / 5.0

Based on verified reviews, certifications, and business history.

Get a Free Quote from iGo Solar

Fill out the form below and iGo Solar will contact you within 24-48 hours.

For iGo Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
i

iGo Solar

4.2 (34)
Get a Free Quote