F

FireFly Solar in Greenville

Greenville, South Carolina·Solar Installation
ResidentialCommercial

10+ yrs

Experience

80 km

Service radius

51-100

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About FireFly Solar

Award-winning Tesla-certified solar and roofing company ranked number two in South Carolina by Solar Power World

Greenville, South Carolina 29607

Greenville, South Carolina 29607

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Premier Certified InstallerTesla Solar Roof CertifiedEnphase Encharge CertifiedBBB A+ Rated

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Maxeon

Batteries

Tesla PowerwallEnphase Encharge

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Greenville, South CarolinaSpartanburg, South CarolinaAnderson, South CarolinaSimpsonville, South CarolinaPiedmont, South CarolinaGreer, South Carolina

Customer Reviews

No reviews yet. Be the first to review FireFly Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from FireFly Solar?

You can request a quote through the form on this page or contact FireFly Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does FireFly Solar serve?

FireFly Solar is based in Greenville and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does FireFly Solar hold?

This profile lists the following reported certifications: Tesla Premier Certified Installer, Tesla Solar Roof Certified, Enphase Encharge Certified, BBB A+ Rated. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does FireFly Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask FireFly Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask FireFly Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does FireFly Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask FireFly Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees51-100
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from FireFly Solar

Send your project details to request follow-up from FireFly Solar. Response timing and consultation terms are set by the company.

For FireFly Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
F

FireFly Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.