Solar Installers in South Carolina
Compare published solar company information across South Carolina, verify credentials directly, and request quotes from local installers.
Find Solar Installers by City
Browse 2 cities in South Carolina. Select a city to see local installers.
All Solar Installers in South Carolina
20 solar companies across South Carolina
Alder Energy Systems
Reported credentials: BBB Accredited · NABCEP Certified
REC + SolarEdge
Boss Energy
Reported credentials: Tesla Certified Installer
REC + Enphase
Brightest Solar
Reported credentials: BBB Accredited
Hanwha Q Cells + Enphase
Cornerstone Construction
Detail Solar
Reported credentials: NABCEP Certified · SolarEdge Certified · Enphase Certified · Generac Certified
SolarEdge
EMPWR Solar
Reported credentials: BBB Accredited
REC + Enphase
FireFly Solar
Reported credentials: Tesla Premier Certified Installer · Tesla Solar Roof Certified · Enphase Encharge Certified · BBB A+ Rated
Maxeon
Greenville Solar Solutions
Lowcountry Solar Solutions
Hanwha Q Cells + Enphase
Perfection Solar
Renu Energy Solutions
Reported credentials: SolarEdge Certified
SolarEdge
SC Solar Energy
Hanwha Q Cells + Enphase
How We Rank Solar Installers
Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.
Customer Reviews
Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.
Certifications
NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.
Track Record
Published profile fields help users compare companies. These details are not a quality score and must be verified directly.
Why Trust the SurgePV Directory?
Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.
20
Published Profiles
0
Customer Reviews
Design Faster. Sell More.
SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.
60%
Faster project design
10 min
Full design turnaround
Frequently Asked Questions
How much do solar panels cost in South Carolina?
Solar panel costs in South Carolina typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.
What certifications should I look for?
NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required South Carolina state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.
What solar incentives are available in South Carolina?
The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in South Carolina can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current South Carolina-specific incentives.
Are You a Solar Installer in South Carolina?
List your company for free and connect with local customers looking for solar installation services.
List Your Company Free