E

EmPower Solar in New York

New York, New York·Solar Installation
ResidentialCommercial

23+ yrs

Experience

4000+

Projects

80 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About EmPower Solar

New York's premier SunPower Master Dealer with over 4,000 installations and 50 MW of distributed solar since 2003

New York, New York 11714

New York, New York 11714

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignMaintenanceMonitoringGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Master DealerNYSERDA Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SunPowerEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Queens, New YorkBrooklyn, New YorkManhattan, New YorkBronx, New YorkStaten Island, New YorkLong Island, New York

Customer Reviews

No reviews yet. Be the first to review EmPower Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from EmPower Solar?

You can request a quote through the form on this page or contact EmPower Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does EmPower Solar serve?

EmPower Solar is based in New York and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does EmPower Solar hold?

This profile lists the following reported certifications: SunPower Master Dealer, NYSERDA Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does EmPower Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask EmPower Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask EmPower Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does EmPower Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask EmPower Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2003
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from EmPower Solar

Send your project details to request follow-up from EmPower Solar. Response timing and consultation terms are set by the company.

For EmPower Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

EmPower Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.