Solar Installers in New York, New York

10 Companies 402 Reviews 4.6 Avg
All ResidentialCommercialIndustrial

Top Solar Installers in New York

Ranked by rating and customer reviews

SP
1

Solar Pro

Verified
5.0 (50 reviews)
Est. 2022 · New York, New York · 25yr warranty
SolarDesignGrid ConnectionMaintenance

BBB Accredited

SM
2

Solar Mentor

4.9 (25 reviews)
New York, New York · 25yr warranty
SolarDesignMaintenanceGrid Connection
BS
3

Brooklyn SolarWorks

Verified
4.8 (150 reviews)
Est. 2015 · New York, New York · 25yr warranty
SolarBatteryDesignMaintenance

BBB Accredited · NABCEP · NYSERDA Certified

NS
4

NY State Solar

Verified
4.7 (38 reviews)
Est. 2015 · New York, New York · 25yr warranty
SolarBatteryDesignMaintenance

BBB Accredited · NYSERDA Gold Quality

AP
5

Accord Power

Verified
4.6 (20 reviews)
Est. 2009 · New York, New York · 25yr warranty
SolarBatteryEV ChargingDesign

BBB Accredited

ES
6

EmPower Solar

Verified
4.5 (36 reviews)
Est. 2003 · New York, New York · 25yr warranty
SolarBatteryEV ChargingDesign

SunPower Master Dealer · NYSERDA Certified

SunPower + SunPower

GC
7

Grid City Electric

Verified
4.5 (23 reviews)
Est. 2007 · New York, New York · 25yr warranty
SolarBatteryDesignMonitoring

NABCEP · NV Master Electrician

QS
8

Quixotic Systems

Verified
4.5 (10 reviews)
Est. 1999 · New York, New York · 25yr warranty
SolarDesignMaintenanceGrid Connection

NABCEP · NYSERDA Certified · NYC Licensed General Contractor

SE
9

Solar Energy Systems

Verified
4.5 (10 reviews)
Est. 1998 · New York, New York · 25yr warranty
SolarDesignMaintenanceMonitoring

NABCEP · NYSERDA Certified

YS
10

YSG Solar

4.2 (40 reviews)
Est. 2010 · New York, New York · 25yr warranty
SolarDesignMaintenanceMonitoring

What Solar Costs in New York

$2.50-$3.50

Cost per Watt

$20,000-$28,000

Typical 8kW System

8-12 yrs

Payback Period

$1,400-$2,400

Annual Savings (8kW)

Based on national averages. The 30% federal residential tax credit expired Dec 31, 2025. State and local incentives may reduce your net cost. Get quotes from multiple installers for accurate pricing.

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score.

Customer Reviews

We aggregate ratings from Google, Yelp, BBB, and SolarReviews.

Certifications

NABCEP certification is the US gold standard. We also check state licensing and manufacturer certifications.

Track Record

Years in business, projects completed, and warranty coverage contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking.

10

Verified Companies

402

Customer Reviews

Solar Installation in New York, New York

New York homeowners are investing in solar to reduce electricity bills and increase property value. A typical residential system generates 9,600-14,400 kWh per year, offsetting 80-100% of household electricity use depending on system size and roof orientation.

How to Choose an Installer in New York

Start by checking NABCEP certification and New York state contractor licensing. Get at least three written quotes that include equipment specifications, total cost, expected annual production, and warranty terms. Compare not just price, but also equipment quality, warranty length, and the company's track record in New York.

What to Expect

The process from signing a contract to turning on your system takes 6-12 weeks. Your installer handles design, permitting, installation (1-3 days), inspection, and utility interconnection. Once the utility grants Permission to Operate (PTO), your system goes live and starts generating savings.

More Cities in New York

Find solar installers in other New York cities

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation: Step by Step

1

Free Consultation

Contact an installer for a free site assessment. They'll evaluate your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, costs, available state incentives, and projected returns.

3

Permitting

Your installer handles building permits, HOA approvals, and utility interconnection applications.

4

Installation

Panels, inverter, and wiring are installed in 1-3 days. Followed by city inspection.

5

Permission to Operate

Utility grants PTO, system goes live, and you start generating clean energy.

Frequently Asked Questions

How much do solar panels cost in New York?

Solar panel costs in New York typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. New York state and local incentives, net metering, and SRECs may help reduce your net cost.

Who is the best solar installer in New York?

The best solar installer in New York depends on your needs, budget, and project type. Check ratings, reviews, certifications (NABCEP), and experience on this page. Get quotes from at least three installers to compare.

How long does solar installation take?

Physical installation takes 1-3 days. The full process from contract to Permission to Operate typically takes 6-12 weeks, including design, permitting, installation, inspection, and utility interconnection.

Do I need permits for solar panels?

Yes. Solar installations require building and electrical permits. Your installer handles all permitting, including HOA approval and utility interconnection. Some jurisdictions use SolarAPP+ for same-day automated approvals.

What solar incentives are available in New York?

The 30% federal residential clean energy tax credit (ITC) expired on December 31, 2025. However, New York may offer state-level incentives such as rebates, performance-based incentives, or solar renewable energy certificates (SRECs). Net metering policies vary by utility - check with your local utility in New York to see if they offer full retail credit for exported solar power. Your installer should walk you through all available incentives during the quoting process.

How much can I save with solar panels in New York?

Savings depend on your electricity rate, system size, and sun exposure. A typical 8kW system offsets $1,400-$2,400 per year in electricity costs. Over 25 years, total savings typically range from $25,000-$50,000. Your installer can provide a detailed savings estimate based on your specific utility rate and energy usage.

Should I get battery storage with my solar panels?

Battery storage ($12,000-$18,000 installed) is worth considering if you have time-of-use electricity rates, experience frequent power outages, or want energy independence. Without favorable net metering, batteries help you use more of your own solar power instead of exporting it at lower rates. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.

What equipment should I look for?

Top-tier solar panels include REC, Q Cells, Canadian Solar, and Silfab. For inverters, Enphase microinverters (25-year warranty) and SolarEdge optimizers are the most popular. Your installer should offer multiple equipment options at different price points and explain the trade-offs.

Are You a Solar Installer in New York?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free