B

Blue Raven Solar

Orem, Utah · Solar Installers
Claimed Verified Licensed

12+ yrs

Experience

678 reviews

4.4 avg rating

1001-5000

Employees

4.4
678 reviews
Est. 2014

SurgePV Score

5.9 / 10
Customer Reviews 88%
Certifications 50%
Experience 80%
Services Range 40%
Warranty Coverage 0%
Online Presence 50%

About Blue Raven Solar

Blue Raven Solar provides affordable residential solar installations across 17 states. Founded in 2014, we have grown to become one of the fastest-growing solar companies in America, focusing on homeowner savings and exceptional service.

123 Main Street

Orem, Utah 84058

Services Offered

Solar Installers Solar Financing

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Orem, Utah Phoenix, Arizona
4.4

678 reviews

5
1
4
0
3
0
2
0
1
0
Amanda Lee Verified
Jun 10, 2026

Blue Raven exceeded expectations

From the first consultation to the final inspection, Blue Raven was professional and thorough. Our 8kW system is producing more than projected and the BluePower Plus+ financing made it affordable.

Write a Review

Frequently Asked Questions

How do I get a quote from Blue Raven Solar?

You can request a free quote by filling out the form on this page or contacting Blue Raven Solar directly via phone or email. Most installers provide a free initial consultation and site assessment.

What areas does Blue Raven Solar serve?

Blue Raven Solar is based in Orem. Check the Service Areas section above for a complete list of locations.

What certifications does Blue Raven Solar hold?

Blue Raven Solar meets all required local licensing and insurance requirements for solar installation work.

What warranty does Blue Raven Solar offer?

Blue Raven Solar provides standard manufacturer warranties on all equipment plus workmanship coverage. Contact them directly for specific warranty details.

How long does installation take?

Most residential solar installations are completed within 1-3 days after permits are approved. The full timeline from consultation to activation typically ranges from 4-12 weeks depending on local permitting and utility interconnection processes.

Does Blue Raven Solar handle permits and paperwork?

Yes, most solar installers including Blue Raven Solar handle all necessary permits, utility interconnection applications, and incentive paperwork as part of their service. Confirm specific details during your consultation.

Business Details

Founded 2014
Employees 1001-5000
Profile Status Unclaimed
Verification Level 5/6
Profile Complete 88%

Trust Score

4.4 / 5.0

Based on verified reviews, certifications, and business history.

Get a Free Quote from Blue Raven Solar

Fill out the form below and Blue Raven Solar will contact you within 24-48 hours.

For Blue Raven Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Blue Raven Solar

4.4 (678)
Get a Free Quote