Back to Blue Raven Solar
B

Blue Raven Solar Reviews

Orem, Utah

4.4

678 reviews

5
1
4
0
3
0
2
0
1
0

Write a Review

All Reviews (678)

Amanda Lee Verified
Jun 10, 2026

Blue Raven exceeded expectations

From the first consultation to the final inspection, Blue Raven was professional and thorough. Our 8kW system is producing more than projected and the BluePower Plus+ financing made it affordable.