A

Artisan Electric in Seattle

Seattle, Washington·Solar Installation
ResidentialCommercial

19+ yrs

Experience

80 km

Service radius

51-100

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Artisan Electric

Largest residential and commercial solar installer using licensed union electricians in Washington

Seattle, Washington 98108

Seattle, Washington 98108

Services Offered

Solar InstallationBattery StorageEV Chargingelectrical_services

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Solar Roof CertifiedTesla Powerwall CertifiedIBEW Union Labor

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

TeslaSilfab

Inverters

EnphaseTesla

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Seattle, WashingtonTacoma, WashingtonBellevue, WashingtonEverett, WashingtonOlympia, Washington

Customer Reviews

No reviews yet. Be the first to review Artisan Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Artisan Electric?

You can request a quote through the form on this page or contact Artisan Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Artisan Electric serve?

Artisan Electric is based in Seattle and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Artisan Electric hold?

This profile lists the following reported certifications: Tesla Solar Roof Certified, Tesla Powerwall Certified, IBEW Union Labor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Artisan Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Artisan Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Artisan Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Artisan Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Artisan Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2007
Employees51-100
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Artisan Electric

Send your project details to request follow-up from Artisan Electric. Response timing and consultation terms are set by the company.

For Artisan Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Artisan Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.