Solar Installers in Seattle, Washington

10 Companies0 Reviews
AllResidentialCommercialIndustrial

Top Solar Installers in Seattle

Profiles are listed alphabetically within their publication tier. Verify credentials and references directly.

AS
1

A&R Solar

Est. 2007·Seattle, Washington·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: B Corporation · NABCEP

AE
2

Artisan Electric

Est. 2007·Seattle, Washington·Reported 25yr warranty
SolarBatteryEV Chargingelectrical_services

Reported credentials: Tesla Solar Roof Certified · Tesla Powerwall Certified · IBEW Union Labor

Tesla + Enphase

NE
3

Northwest Electric & Solar

Est. 2011·Seattle, Washington·Reported 25yr warranty
SolarBatteryEV Chargingelectrical_services

Reported credentials: BBB Accredited · Tesla Premier Certified

Tesla + Tesla

PS
4

Puget Sound Solar

Est. 2001·Seattle, Washington·Reported 25yr warranty
SolarBatterysystem_design

Reported credentials: BBB Accredited · NABCEP

SS
5

Solterra Solar

Est. 2008·Seattle, Washington·Reported 25yr warranty
SolarBattery

Reported credentials: WOSB (Woman-Owned Small Business)

SS
6

Sphere Solar Energy

Est. 2015·Seattle, Washington·Reported 25yr warranty
SolarBatteryEV Charging
SS
7

Sunergy Systems

Est. 2005·Seattle, Washington·Reported 25yr warranty
SolarBatterysystem_design

Reported credentials: REC Certified Installer · Tesla Powerwall Certified

REC + Enphase

SE
8

Switch Electric Home Energy

Est. 2009·Seattle, Washington·Reported 25yr warranty
SolarBatteryEV Chargingelectrical_services
WS
9

West Seattle Electric and Solar

Est. 2017·Seattle, Washington·Reported 25yr warranty
SolarBatteryelectrical_services

Reported credentials: BBB Accredited

WS
10

Western Solar Solutions

Seattle, Washington·Reported 25yr warranty
SolarBattery

What Solar Costs in Seattle

$2.50-$3.50

Cost per Watt

$20,000-$28,000

Typical 8kW System

8-12 yrs

Payback Period

$1,400-$2,400

Annual Savings (8kW)

Based on national averages. The 30% federal residential tax credit expired Dec 31, 2025. State and local incentives may reduce your net cost. Get quotes from multiple installers for accurate pricing.

How We Rank Solar Installers

Directory ordering uses currently published profile information. Ratings are withheld unless their source and verification can be documented.

Customer Reviews

Check current customer feedback on the original review platform and request recent references.

Certifications

NABCEP certification is the US gold standard. We also check state licensing and manufacturer certifications.

Track Record

Published profile fields help users compare companies. They do not constitute a quality score.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. Confirm licensing, certifications, active-trading status, references, and contract terms directly before hiring.

10

Published Profiles

0

Customer Reviews

Solar Installation in Seattle, Washington

Seattle homeowners are investing in solar to reduce electricity bills and increase property value. A typical residential system generates 9,600-14,400 kWh per year, offsetting 80-100% of household electricity use depending on system size and roof orientation.

How to Choose an Installer in Seattle

Start by checking NABCEP certification and Washington state contractor licensing. Get at least three written quotes that include equipment specifications, total cost, expected annual production, and warranty terms. Compare not just price, but also equipment quality, warranty length, and the company's track record in Seattle.

What to Expect

The process from signing a contract to turning on your system takes 6-12 weeks. Your installer handles design, permitting, installation (1-3 days), inspection, and utility interconnection. Once the utility grants Permission to Operate (PTO), your system goes live and starts generating savings.

More Cities in Washington

Find solar installers in other Washington cities

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation: Step by Step

1

Free Consultation

Contact an installer for a free site assessment. They'll evaluate your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, costs, available state incentives, and projected returns.

3

Permitting

Your installer handles building permits, HOA approvals, and utility interconnection applications.

4

Installation

Panels, inverter, and wiring are installed in 1-3 days. Followed by city inspection.

5

Permission to Operate

Utility grants PTO, system goes live, and you start generating clean energy.

Frequently Asked Questions

How much do solar panels cost in Seattle?

Solar panel costs in Seattle typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. Washington state and local incentives, net metering, and SRECs may help reduce your net cost.

Who is the best solar installer in Seattle?

The best solar installer in Seattle depends on your needs, budget, and project type. Check ratings, reviews, certifications (NABCEP), and experience on this page. Get quotes from at least three installers to compare.

How long does solar installation take?

Physical installation takes 1-3 days. The full process from contract to Permission to Operate typically takes 6-12 weeks, including design, permitting, installation, inspection, and utility interconnection.

Do I need permits for solar panels?

Yes. Solar installations require building and electrical permits. Your installer handles all permitting, including HOA approval and utility interconnection. Some jurisdictions use SolarAPP+ for same-day automated approvals.

What solar incentives are available in Seattle?

The 30% federal residential clean energy tax credit (ITC) expired on December 31, 2025. However, Washington may offer state-level incentives such as rebates, performance-based incentives, or solar renewable energy certificates (SRECs). Net metering policies vary by utility - check with your local utility in Seattle to see if they offer full retail credit for exported solar power. Your installer should walk you through all available incentives during the quoting process.

How much can I save with solar panels in Seattle?

Savings depend on your electricity rate, system size, and sun exposure. A typical 8kW system offsets $1,400-$2,400 per year in electricity costs. Over 25 years, total savings typically range from $25,000-$50,000. Your installer can provide a detailed savings estimate based on your specific utility rate and energy usage.

Should I get battery storage with my solar panels?

Battery storage ($12,000-$18,000 installed) is worth considering if you have time-of-use electricity rates, experience frequent power outages, or want energy independence. Without favorable net metering, batteries help you use more of your own solar power instead of exporting it at lower rates. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.

What equipment should I look for?

Top-tier solar panels include REC, Q Cells, Canadian Solar, and Silfab. For inverters, Enphase microinverters (25-year warranty) and SolarEdge optimizers are the most popular. Your installer should offer multiple equipment options at different price points and explain the trade-offs.

Are You a Solar Installer in Seattle?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.