A

AltEnergy

San Antonio, Texas · Solar Installers
Claimed

12+ yrs

Experience

56 reviews

4.4 avg rating

11-50

Employees

4.4
56 reviews
Est. 2014

SurgePV Score

5.1 / 10
Customer Reviews 88%
Certifications 25%
Experience 80%
Services Range 20%
Warranty Coverage 0%
Online Presence 50%

About AltEnergy

AltEnergy is a San Antonio solar installer specializing in residential and small commercial solar projects. We are a local, veteran-owned business committed to helping South Texas families reduce their energy bills and carbon footprint. We offer zero-down financing and a 25-year production guarantee.

3456 Sunshine Rd

San Antonio, Texas 78205

Services Offered

Solar Installers

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Customer Reviews

View all 56 reviews →
4.4

56 reviews

5
1
4
0
3
0
2
0
1
0
Robert Garcia Verified
Jun 10, 2026

Veteran-owned and it shows

As a fellow veteran, I wanted to support a veteran-owned business. AltEnergy exceeded every expectation. Professional, punctual, and the pricing was better than three other quotes I received.

Write a Review

Frequently Asked Questions

How do I get a quote from AltEnergy?

You can request a free quote by filling out the form on this page or contacting AltEnergy directly via phone or email. Most installers provide a free initial consultation and site assessment.

What areas does AltEnergy serve?

AltEnergy is based in San Antonio. Check the Service Areas section above for a complete list of locations.

What certifications does AltEnergy hold?

AltEnergy meets all required local licensing and insurance requirements for solar installation work.

What warranty does AltEnergy offer?

AltEnergy provides standard manufacturer warranties on all equipment plus workmanship coverage. Contact them directly for specific warranty details.

How long does installation take?

Most residential solar installations are completed within 1-3 days after permits are approved. The full timeline from consultation to activation typically ranges from 4-12 weeks depending on local permitting and utility interconnection processes.

Does AltEnergy handle permits and paperwork?

Yes, most solar installers including AltEnergy handle all necessary permits, utility interconnection applications, and incentive paperwork as part of their service. Confirm specific details during your consultation.

Business Details

Founded 2014
Employees 11-50
Profile Status Unclaimed
Verification Level 3/6
Profile Complete 78%

Trust Score

4.3 / 5.0

Based on verified reviews, certifications, and business history.

Get a Free Quote from AltEnergy

Fill out the form below and AltEnergy will contact you within 24-48 hours.

For AltEnergy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

AltEnergy

4.4 (56)
Get a Free Quote