Yes Solar Solutions in Greensboro
17+ yrs
Experience
160 km
Service radius
11-50
Employees
Profile information
About Yes Solar Solutions
Woman-owned NC solar installer since 2009 serving residential, commercial, and government clients with customized systems
Greensboro, North Carolina 27513
Greensboro, North Carolina 27513
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Yes Solar Solutions!
Frequently Asked Questions
How do I get a quote from Yes Solar Solutions?
You can request a quote through the form on this page or contact Yes Solar Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Yes Solar Solutions serve?
Yes Solar Solutions is based in Greensboro and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Yes Solar Solutions hold?
This profile lists the following reported certifications: NABCEP Certified, BBB Accredited, Woman-Owned Business. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Yes Solar Solutions offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Yes Solar Solutions for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Yes Solar Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Yes Solar Solutions handle permits and paperwork?
The exact scope is not verified on this profile. Ask Yes Solar Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Yes Solar Solutions
Send your project details to request follow-up from Yes Solar Solutions. Response timing and consultation terms are set by the company.
For Yes Solar Solutions
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Yes Solar Solutions