U

United Better Homes in Providence

Providence, Rhode Island·Solar Installation
Residential

23+ yrs

Experience

400+

Projects

60 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About United Better Homes

Family-owned Rhode Island home improvement company offering solar, roofing, windows, and siding since 2003

Providence, Rhode Island 02863

Providence, Rhode Island 02863

Services Offered

Solar InstallationBattery StorageroofingSolar DesignEnergy AuditGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Qcells

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Providence, Rhode IslandCentral Falls, Rhode IslandPawtucket, Rhode IslandCranston, Rhode IslandWarwick, Rhode IslandEast Providence, Rhode IslandWoonsocket, Rhode IslandNorth Providence, Rhode Island

Customer Reviews

No reviews yet. Be the first to review United Better Homes!

Write a Review

Frequently Asked Questions

How do I get a quote from United Better Homes?

You can request a quote through the form on this page or contact United Better Homes directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does United Better Homes serve?

United Better Homes is based in Providence and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does United Better Homes hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does United Better Homes offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask United Better Homes for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask United Better Homes for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does United Better Homes handle permits and paperwork?

The exact scope is not verified on this profile. Ask United Better Homes which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2003
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from United Better Homes

Send your project details to request follow-up from United Better Homes. Response timing and consultation terms are set by the company.

For United Better Homes

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
U

United Better Homes

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.