T

TFM Renewables in Peterborough

Peterborough·Solar Installation
ResidentialCommercial

2+ yrs

Experience

60 km

Service radius

1-10

Employees

Profile information

67%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About TFM Renewables

Solar PV and battery storage installer covering Peterborough and the East of England since 2024

Peterborough, CB22 3HB

Peterborough CB22 3HB

Services Offered

Solar InstallationBattery Storage

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

PeterboroughCambridgeHuntingdonBedfordBury St Edmunds

Customer Reviews

No reviews yet. Be the first to review TFM Renewables!

Write a Review

Frequently Asked Questions

How do I get a quote from TFM Renewables?

You can request a quote through the form on this page or contact TFM Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does TFM Renewables serve?

TFM Renewables is based in Peterborough and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does TFM Renewables hold?

This profile does not list independently verified certifications. Ask TFM Renewables for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does TFM Renewables offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask TFM Renewables for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask TFM Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does TFM Renewables handle permits and paperwork?

The exact scope is not verified on this profile. Ask TFM Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2024
Employees1-10
Profile StatusUnclaimed
Profile Complete67%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from TFM Renewables

Send your project details to request follow-up from TFM Renewables. Response timing and consultation terms are set by the company.

For TFM Renewables

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

TFM Renewables

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.