Sun's Eye Solar in Tacoma
34+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Sun's Eye Solar
Tacoma's longest-running solar installer, designing and installing residential and commercial systems since 1992
Tacoma, Washington 98409
Tacoma, Washington 98409
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Sun's Eye Solar!
Frequently Asked Questions
How do I get a quote from Sun's Eye Solar?
You can request a quote through the form on this page or contact Sun's Eye Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Sun's Eye Solar serve?
Sun's Eye Solar is based in Tacoma and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Sun's Eye Solar hold?
This profile lists the following reported certifications: Tesla Certified Installer, Enphase Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Sun's Eye Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sun's Eye Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Sun's Eye Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Sun's Eye Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Sun's Eye Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Sun's Eye Solar
Send your project details to request follow-up from Sun's Eye Solar. Response timing and consultation terms are set by the company.
For Sun's Eye Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Sun's Eye Solar