SunnyMac Solar in Wilmington
17+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About SunnyMac Solar
Published directory profile for SunnyMac Solar in Wilmington. Verify services, credentials, ratings, and references directly with their original sources.
Wilmington, Delaware 19809
Wilmington, Delaware 19809
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review SunnyMac Solar!
Frequently Asked Questions
How do I get a quote from SunnyMac Solar?
You can request a quote through the form on this page or contact SunnyMac Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SunnyMac Solar serve?
SunnyMac Solar is based in Wilmington and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SunnyMac Solar hold?
This profile lists the following reported certifications: BBB A+, 2025 BBB Torch Award for Ethics, Top 10 Residential Solar Company (Solar Power World 2025). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does SunnyMac Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SunnyMac Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SunnyMac Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SunnyMac Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask SunnyMac Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from SunnyMac Solar
Send your project details to request follow-up from SunnyMac Solar. Response timing and consultation terms are set by the company.
For SunnyMac Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SunnyMac Solar