S

Sun Valley Solar Solutions in Scottsdale

Scottsdale, Arizona·Solar Installation
ResidentialCommercial

20+ yrs

Experience

100 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Sun Valley Solar Solutions

NABCEP-certified SunPower authorized dealer since 2006 ranked #1 solar installer in Arizona by Ranking Arizona

Scottsdale, Arizona 85225

Scottsdale, Arizona 85225

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPSunPower Authorized DealerSRP Preferred Solar InstallerBBB A+ Rating

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Scottsdale, ArizonaPhoenix, ArizonaChandler, ArizonaTempe, ArizonaMesa, ArizonaGilbert, ArizonaSurprise, Arizona

Customer Reviews

No reviews yet. Be the first to review Sun Valley Solar Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Sun Valley Solar Solutions?

You can request a quote through the form on this page or contact Sun Valley Solar Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sun Valley Solar Solutions serve?

Sun Valley Solar Solutions is based in Scottsdale and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sun Valley Solar Solutions hold?

This profile lists the following reported certifications: NABCEP, SunPower Authorized Dealer, SRP Preferred Solar Installer, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Sun Valley Solar Solutions offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Sun Valley Solar Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sun Valley Solar Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sun Valley Solar Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sun Valley Solar Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2006
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sun Valley Solar Solutions

Send your project details to request follow-up from Sun Valley Solar Solutions. Response timing and consultation terms are set by the company.

For Sun Valley Solar Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sun Valley Solar Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.