SP Renewables in Gloucester
50 km
Service radius
11-50
Employees
Profile information
About SP Renewables
MCS registered solar PV and battery storage specialists with over 10 years in Stroud and Gloucestershire
Gloucester, GL5 3JX
Gloucester GL5 3JX
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review SP Renewables!
Frequently Asked Questions
How do I get a quote from SP Renewables?
You can request a quote through the form on this page or contact SP Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SP Renewables serve?
SP Renewables is based in Gloucester and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SP Renewables hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does SP Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SP Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SP Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SP Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask SP Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from SP Renewables
Send your project details to request follow-up from SP Renewables. Response timing and consultation terms are set by the company.
For SP Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SP Renewables