S

Southern Solar Systems in Huntsville

Huntsville, Alabama·Solar Installation
ResidentialCommercial

19+ yrs

Experience

150 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Southern Solar Systems

Huntsville's established solar and geothermal installer since 2007 serving residential and commercial clients across the Southeast

Huntsville, Alabama 35803

Huntsville, Alabama 35803

Services Offered

Solar InstallationSolar DesignMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedLicensed Electrical ContractorAlabama Solar Industry Association Member

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

WaterFurnace

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Huntsville, AlabamaMadison, AlabamaDecatur, AlabamaAthens, AlabamaFlorence, AlabamaScottsboro, Alabama

Customer Reviews

No reviews yet. Be the first to review Southern Solar Systems!

Write a Review

Frequently Asked Questions

How do I get a quote from Southern Solar Systems?

You can request a quote through the form on this page or contact Southern Solar Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Southern Solar Systems serve?

Southern Solar Systems is based in Huntsville and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Southern Solar Systems hold?

This profile lists the following reported certifications: NABCEP Certified, Licensed Electrical Contractor, Alabama Solar Industry Association Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Southern Solar Systems offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Southern Solar Systems for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Southern Solar Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Southern Solar Systems handle permits and paperwork?

The exact scope is not verified on this profile. Ask Southern Solar Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2007
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Southern Solar Systems

Send your project details to request follow-up from Southern Solar Systems. Response timing and consultation terms are set by the company.

For Southern Solar Systems

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Southern Solar Systems

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.