Southern Solar Systems in Birmingham
19+ yrs
Experience
250 km
Service radius
2-10
Employees
Profile information
About Southern Solar Systems
Licensed electrical contractor providing turnkey solar solutions across the Southeast since 2007
Birmingham, Alabama 35803
Birmingham, Alabama 35803
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Southern Solar Systems!
Frequently Asked Questions
How do I get a quote from Southern Solar Systems?
You can request a quote through the form on this page or contact Southern Solar Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Southern Solar Systems serve?
Southern Solar Systems is based in Birmingham and serves within a 250 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Southern Solar Systems hold?
This profile does not list independently verified certifications. Ask Southern Solar Systems for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Southern Solar Systems offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Southern Solar Systems for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Southern Solar Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Southern Solar Systems handle permits and paperwork?
The exact scope is not verified on this profile. Ask Southern Solar Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Southern Solar Systems
Send your project details to request follow-up from Southern Solar Systems. Response timing and consultation terms are set by the company.
For Southern Solar Systems
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Southern Solar Systems