Solum GB in Bournemouth
19+ yrs
Experience
60 km
Service radius
11-50
Employees
Profile information
About Solum GB
Multi-award winning solar PV, heat pump and battery installer serving Bournemouth and Dorset since 2007
Bournemouth, BH8 8AX
Bournemouth BH8 8AX
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
30yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solum GB!
Frequently Asked Questions
How do I get a quote from Solum GB?
You can request a quote through the form on this page or contact Solum GB directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solum GB serve?
Solum GB is based in Bournemouth and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solum GB hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solum GB offer?
This profile reports 30-year panel coverage and 10-year workmanship coverage. Ask Solum GB for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solum GB for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solum GB handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solum GB which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Solum GB
Send your project details to request follow-up from Solum GB. Response timing and consultation terms are set by the company.
For Solum GB
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solum GB