S

Solgen Power in Cincinnati

Cincinnati, Ohio·Solar Installation
Residential

9+ yrs

Experience

150 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solgen Power

National solar installer with a dedicated Cincinnati office serving Ohio homeowners

Cincinnati, Ohio 45216

Cincinnati, Ohio 45216

Services Offered

Solar InstallationBattery Storagesystem_design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Cincinnati, OhioDayton, OhioColumbus, OhioNorthern Kentucky, OhioLouisville, Ohio

Customer Reviews

No reviews yet. Be the first to review Solgen Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Solgen Power?

You can request a quote through the form on this page or contact Solgen Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solgen Power serve?

Solgen Power is based in Cincinnati and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solgen Power hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solgen Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solgen Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solgen Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solgen Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solgen Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2017
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solgen Power

Send your project details to request follow-up from Solgen Power. Response timing and consultation terms are set by the company.

For Solgen Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solgen Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.