Solaris Renewables
9+ yrs
Experience
33 reviews
4.8 avg rating
100 km
Service radius
11-50
Employees
SurgePV Score
About Solaris Renewables
Locally owned Massachusetts solar installer specializing in custom residential solar systems since 2017
Worcester, Massachusetts 01923
Worcester, Massachusetts 01923
Services Offered
Certifications
Partner Manufacturers
Inverters
Warranty Coverage
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
View all 33 reviews →33 reviews
Solaris Renewables installed our system in Worcester and it was a great experience. The team was thorough in their site assessment and designed a system that works perfectly for our home.
From the initial consultation to the final inspection, Solaris was professional and transparent. Our panels have been producing consistently above estimates.
Good local company that takes pride in their work. The installation was clean and well done. They helped us through the SMART program application process.
Frequently Asked Questions
How do I get a quote from Solaris Renewables?
You can request a free quote by filling out the form on this page or contacting Solaris Renewables directly via phone or email. Most installers provide a free initial consultation and site assessment.
What areas does Solaris Renewables serve?
Solaris Renewables is based in Worcester and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solaris Renewables hold?
Solaris Renewables holds the following certifications: MassCEC Approved. These certifications ensure compliance with industry standards and local regulations.
What warranty does Solaris Renewables offer?
Solaris Renewables offers 25-year panel warranty, 10-year installation workmanship warranty. Specific terms may vary by product and project.
How long does installation take?
Most residential solar installations are completed within 1-3 days after permits are approved. The full timeline from consultation to activation typically ranges from 4-12 weeks depending on local permitting and utility interconnection processes.
Does Solaris Renewables handle permits and paperwork?
Yes, most solar installers including Solaris Renewables handle all necessary permits, utility interconnection applications, and incentive paperwork as part of their service. Confirm specific details during your consultation.
Contact Information
Request a QuoteBusiness Details
Trust Score
Based on verified reviews, certifications, and business history.
Get a Free Quote from Solaris Renewables
Fill out the form below and Solaris Renewables will contact you within 24-48 hours.
For Solaris Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solaris Renewables