Solar Side Up in Denver
15+ yrs
Experience
1500+
Projects
80 km
Service radius
11-50
Employees
Profile information
About Solar Side Up
Denver's trusted Enphase Platinum Installer with 1,500+ solar installations since 2011
Denver, Colorado 80206
Denver, Colorado 80206
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Side Up!
Frequently Asked Questions
How do I get a quote from Solar Side Up?
You can request a quote through the form on this page or contact Solar Side Up directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Side Up serve?
Solar Side Up is based in Denver and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Side Up hold?
This profile lists the following reported certifications: NABCEP, Enphase Platinum, SEIA Member, ASES Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Side Up offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Side Up for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Side Up for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Side Up handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Side Up which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar Side Up
Send your project details to request follow-up from Solar Side Up. Response timing and consultation terms are set by the company.
For Solar Side Up
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Side Up