S

Solar Energy Solutions in Indianapolis

Indianapolis, Indiana·Solar Installation
ResidentialCommercial

20+ yrs

Experience

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Energy Solutions

Indiana's oldest and most experienced local solar installer, family-owned since 2006

Indianapolis, Indiana 46260

Indianapolis, Indiana 46260

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditCommercial SolarMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

EnphaseSolarEdge

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Indianapolis, IndianaEvansville, IndianaBloomington, IndianaCarmel, IndianaFishers, IndianaGreenwood, IndianaNoblesville, IndianaTerre Haute, Indiana

Customer Reviews

No reviews yet. Be the first to review Solar Energy Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Energy Solutions?

You can request a quote through the form on this page or contact Solar Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Energy Solutions serve?

Solar Energy Solutions is based in Indianapolis and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Energy Solutions hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Energy Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Energy Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Energy Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2006
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Energy Solutions

Send your project details to request follow-up from Solar Energy Solutions. Response timing and consultation terms are set by the company.

For Solar Energy Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Energy Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.