Solar by CIR in Buffalo
22+ yrs
Experience
1400+
Projects
100 km
Service radius
51-200
Employees
Profile information
About Solar by CIR
NYSERDA Quality Installer with over 1,400 solar installations and 20 MW installed capacity across Western New York since 2004
Buffalo, New York 14072
Buffalo, New York 14072
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar by CIR!
Frequently Asked Questions
How do I get a quote from Solar by CIR?
You can request a quote through the form on this page or contact Solar by CIR directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar by CIR serve?
Solar by CIR is based in Buffalo and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar by CIR hold?
This profile lists the following reported certifications: NABCEP Certified, NYSERDA Quality Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar by CIR offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar by CIR for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar by CIR for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar by CIR handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar by CIR which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar by CIR
Send your project details to request follow-up from Solar by CIR. Response timing and consultation terms are set by the company.
For Solar by CIR
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar by CIR