S

Solar America in Baton Rouge

Baton Rouge, Louisiana·Solar Installation
ResidentialCommercial

10+ yrs

Experience

20000+

Projects

80 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar America

Award-winning residential solar sales and installation company ranked #1 by Solar Power World

Baton Rouge, Louisiana 70809

Baton Rouge, Louisiana 70809

Services Offered

Solar Installation

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Solar Power World #1 Residential Sales Contractor (2022-2024)

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Baton Rouge, LouisianaPrairieville, LouisianaGonzales, LouisianaDenham Springs, LouisianaHammond, LouisianaLafayette, Louisiana

Customer Reviews

No reviews yet. Be the first to review Solar America!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar America?

You can request a quote through the form on this page or contact Solar America directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar America serve?

Solar America is based in Baton Rouge and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar America hold?

This profile lists the following reported certifications: Solar Power World #1 Residential Sales Contractor (2022-2024). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar America offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar America for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar America for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar America handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar America which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar America

Send your project details to request follow-up from Solar America. Response timing and consultation terms are set by the company.

For Solar America

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar America

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.