Solar Alliance Southeast in Knoxville
11+ yrs
Experience
200 km
Service radius
11-50
Employees
Profile information
About Solar Alliance Southeast
NABCEP-certified EPC firm ranked among the top solar contractors nationwide with Knoxville headquarters
Knoxville, Tennessee 37920
Knoxville, Tennessee 37920
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Alliance Southeast!
Frequently Asked Questions
How do I get a quote from Solar Alliance Southeast?
You can request a quote through the form on this page or contact Solar Alliance Southeast directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Alliance Southeast serve?
Solar Alliance Southeast is based in Knoxville and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Alliance Southeast hold?
This profile lists the following reported certifications: NABCEP, 2025 Top Solar Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Alliance Southeast offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Alliance Southeast for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Alliance Southeast for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Alliance Southeast handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Alliance Southeast which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar Alliance Southeast
Send your project details to request follow-up from Solar Alliance Southeast. Response timing and consultation terms are set by the company.
For Solar Alliance Southeast
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Alliance Southeast