S

Simple Power Solar in Reno

Reno, Nevada·Solar Installation
ResidentialCommercialOff-Grid

13+ yrs

Experience

100 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Simple Power Solar

NABCEP-certified solar contractor specializing in grid-tied and off-grid systems in Reno-Tahoe since 2013

Reno, Nevada 89502

Reno, Nevada 89502

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP Certified PV Installer

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Reno, NevadaSparks, NevadaTruckee, NevadaTahoe, NevadaCarson City, Nevada

Customer Reviews

No reviews yet. Be the first to review Simple Power Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Simple Power Solar?

You can request a quote through the form on this page or contact Simple Power Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Simple Power Solar serve?

Simple Power Solar is based in Reno and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Simple Power Solar hold?

This profile lists the following reported certifications: NABCEP Certified PV Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Simple Power Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Simple Power Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Simple Power Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Simple Power Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Simple Power Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2013
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Simple Power Solar

Send your project details to request follow-up from Simple Power Solar. Response timing and consultation terms are set by the company.

For Simple Power Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Simple Power Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.