R

Revolution Solar in Washington

Washington, District of Columbia·Solar Installation
ResidentialCommercial

11+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Revolution Solar

DC-based solar installer with the most completed projects in the District of Columbia

Washington, District of Columbia 20001

Washington, District of Columbia 20001

Services Offered

Solar InstallationSolar DesignGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedDC Licensed Solar Contractor

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Washington, District of ColumbiaTakoma Park, District of ColumbiaHyattsville, District of ColumbiaCollege Park, District of ColumbiaCheverly, District of Columbia

Customer Reviews

No reviews yet. Be the first to review Revolution Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Revolution Solar?

You can request a quote through the form on this page or contact Revolution Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Revolution Solar serve?

Revolution Solar is based in Washington and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Revolution Solar hold?

This profile lists the following reported certifications: BBB Accredited, DC Licensed Solar Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Revolution Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Revolution Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Revolution Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Revolution Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Revolution Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Revolution Solar

Send your project details to request follow-up from Revolution Solar. Response timing and consultation terms are set by the company.

For Revolution Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

Revolution Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.