R

Renu Energy Solutions in Durham

Durham, North Carolina·Solar Installation
ResidentialCommercial

16+ yrs

Experience

2000+

Projects

150 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Renu Energy Solutions

Top solar and battery installer in the Carolinas with over 2,000 installations since 2010

Durham, North Carolina 27703

Durham, North Carolina 27703

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedBBB AccreditedLicensed General ContractorLicensed Electrical Contractor

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SolarEdgeEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Durham, North CarolinaRaleigh, North CarolinaCharlotte, North CarolinaCary, North CarolinaGreensboro, North Carolina

Customer Reviews

No reviews yet. Be the first to review Renu Energy Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Renu Energy Solutions?

You can request a quote through the form on this page or contact Renu Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Renu Energy Solutions serve?

Renu Energy Solutions is based in Durham and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Renu Energy Solutions hold?

This profile lists the following reported certifications: NABCEP Certified, BBB Accredited, Licensed General Contractor, Licensed Electrical Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Renu Energy Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Renu Energy Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Renu Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Renu Energy Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Renu Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Renu Energy Solutions

Send your project details to request follow-up from Renu Energy Solutions. Response timing and consultation terms are set by the company.

For Renu Energy Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

Renu Energy Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.