Prime Time Solar in Northampton
16+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Prime Time Solar
MCS and HIES certified solar panel installer serving Northamptonshire since 2010
Northampton,
Northampton
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Prime Time Solar!
Frequently Asked Questions
How do I get a quote from Prime Time Solar?
You can request a quote through the form on this page or contact Prime Time Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Prime Time Solar serve?
Prime Time Solar is based in Northampton and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Prime Time Solar hold?
This profile lists the following reported certifications: MCS, HIES, EPVS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Prime Time Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Prime Time Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Prime Time Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Prime Time Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Prime Time Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Prime Time Solar
Send your project details to request follow-up from Prime Time Solar. Response timing and consultation terms are set by the company.
For Prime Time Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Prime Time Solar