Premier Renewables Wiltshire in Swindon
4+ yrs
Experience
50 km
Service radius
1-10
Employees
Profile information
About Premier Renewables Wiltshire
NAPIT-accredited solar, EV charger, and electrical specialists based in Swindon with 16 years of electrical sector experience
Swindon, SN2 1HB
Swindon SN2 1HB
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Premier Renewables Wiltshire!
Frequently Asked Questions
How do I get a quote from Premier Renewables Wiltshire?
You can request a quote through the form on this page or contact Premier Renewables Wiltshire directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Premier Renewables Wiltshire serve?
Premier Renewables Wiltshire is based in Swindon and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Premier Renewables Wiltshire hold?
This profile lists the following reported certifications: MCS, NAPIT, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Premier Renewables Wiltshire offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Premier Renewables Wiltshire for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Premier Renewables Wiltshire for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Premier Renewables Wiltshire handle permits and paperwork?
The exact scope is not verified on this profile. Ask Premier Renewables Wiltshire which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Premier Renewables Wiltshire
Send your project details to request follow-up from Premier Renewables Wiltshire. Response timing and consultation terms are set by the company.
For Premier Renewables Wiltshire
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Premier Renewables Wiltshire