P

PacWest Solar in Spokane

Spokane, Washington·Solar Installation
ResidentialCommercial
0

120 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About PacWest Solar

Residential and commercial solar installer serving the greater Spokane area from Liberty Lake

Spokane, Washington 99019

Spokane, Washington 99019

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Spokane, WashingtonSpokane Valley, WashingtonLiberty Lake, WashingtonAirway Heights, WashingtonCheney, WashingtonDeer Park, WashingtonMedical Lake, WashingtonKennewick, WashingtonPasco, WashingtonRichland, WashingtonWalla Walla, Washington

Customer Reviews

No reviews yet. Be the first to review PacWest Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from PacWest Solar?

You can request a quote through the form on this page or contact PacWest Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does PacWest Solar serve?

PacWest Solar is based in Spokane and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does PacWest Solar hold?

This profile does not list independently verified certifications. Ask PacWest Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does PacWest Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask PacWest Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask PacWest Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does PacWest Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask PacWest Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

0
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from PacWest Solar

Send your project details to request follow-up from PacWest Solar. Response timing and consultation terms are set by the company.

For PacWest Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

PacWest Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.