O

Optimum Electrics in Cambridge

Cambridge·Solar Installation
ResidentialCommercial
0

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Optimum Electrics

MCS-certified solar and electrical specialists serving Cambridge and Cambridgeshire

Cambridge,

Cambridge

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCS

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

CambridgePeterboroughHuntingdonElyBury St Edmunds

Customer Reviews

No reviews yet. Be the first to review Optimum Electrics!

Write a Review

Frequently Asked Questions

How do I get a quote from Optimum Electrics?

You can request a quote through the form on this page or contact Optimum Electrics directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Optimum Electrics serve?

Optimum Electrics is based in Cambridge and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Optimum Electrics hold?

This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Optimum Electrics offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Optimum Electrics for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Optimum Electrics for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Optimum Electrics handle permits and paperwork?

The exact scope is not verified on this profile. Ask Optimum Electrics which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Optimum Electrics

Send your project details to request follow-up from Optimum Electrics. Response timing and consultation terms are set by the company.

For Optimum Electrics

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
O

Optimum Electrics

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.