O

Ohio Power Solutions in Columbus

Columbus, Ohio·Solar Installation
ResidentialCommercial

17+ yrs

Experience

120 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Ohio Power Solutions

NABCEP-certified solar installer with 13+ years of experience serving the Greater Columbus area

Columbus, Ohio 43140

Columbus, Ohio 43140

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenanceMonitoringCommercial Solar

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

SMA

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

15yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Columbus, OhioDublin, OhioWesterville, OhioHilliard, OhioLondon, OhioSpringfield, OhioMarysville, OhioDelaware, Ohio

Customer Reviews

No reviews yet. Be the first to review Ohio Power Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Ohio Power Solutions?

You can request a quote through the form on this page or contact Ohio Power Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Ohio Power Solutions serve?

Ohio Power Solutions is based in Columbus and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Ohio Power Solutions hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Ohio Power Solutions offer?

This profile reports 25-year panel coverage and 15-year workmanship coverage. Ask Ohio Power Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Ohio Power Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Ohio Power Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Ohio Power Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Ohio Power Solutions

Send your project details to request follow-up from Ohio Power Solutions. Response timing and consultation terms are set by the company.

For Ohio Power Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
O

Ohio Power Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.