N

Norcroft Energy in York

York·Solar Installation
ResidentialCommercial
0

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Norcroft Energy

Yorkshire MCS-accredited family solar and electrical contractor serving homes and businesses

York, S35 7AX

York S35 7AX

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

YorkSheffieldBarnsleyLeedsHarrogateWakefield

Customer Reviews

No reviews yet. Be the first to review Norcroft Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Norcroft Energy?

You can request a quote through the form on this page or contact Norcroft Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Norcroft Energy serve?

Norcroft Energy is based in York and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Norcroft Energy hold?

This profile lists the following reported certifications: MCS, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Norcroft Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Norcroft Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Norcroft Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Norcroft Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Norcroft Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Norcroft Energy

Send your project details to request follow-up from Norcroft Energy. Response timing and consultation terms are set by the company.

For Norcroft Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

Norcroft Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.